【转】SAP PP 顾问面试考试试题及资料

SAP PP 顾问面试试题及资料

1.   Master Data

Organizational Structures

·         What are the various organizational structures in the R/3 System?

·         Which R/3 organizational structures are used primarily for PP?

·         What is the relation between controlling area, company code, valuation area, plant and storage location

Material Master

·         What is the purpose of different material master views?

·         Which views are available?

·         Which views are used primarily for PP?

·         What is the relationship between material master views and individual organizational structures?

·         How does the industry sector influence the material master maintenance?

·         How does the material type influence the material master maintenance?

·         What is the difference between external and internal number assignment and how is it set up in Customizing?

·         Which other factors can influence the selection of fields in the material master?

·         How can MRP profile and forecast profile be used to optimize material master maintenance?

·         How can a material master be reorganized (deleted/archived)?

·         Which units of measure can affect processing in the material master (base unit of measure, production unit, order unit, etc.)?

·         What is the material status used for and on which levels could it be maintained?

·         Review the usage of the following settings?

-          MRP group

-          MRP type

-          Reorder point

-          Planning time fence

-          MRP controller

-          Lot size

-          Procurement type

-          Special procurement type

-          Production storage location

Backflush flag

-          Stock determination group

-          Bulk material

-          Scheduling margin key

-          Safety stock

-          Strategy group

-          Consumption mode and consumption period

-          Availability checking group

-          Alternative selection flag

-          Dependent requirement flag for individual and collective requirements

-          Production scheduler

-          Production scheduling profile

-          Underdelivery/overdelivery tolerance

-          In-house production time (lot size dependent/independent)

-          Valuation class

-          Price control indicator

-          Moving average price/standard price

Bills of Material

·         What is determined by BOM usage?

·         What technical types of BOM are available?

·         Can the technical type of a BOM be changed?

·         During which processes will BOM usage and status be considered?

·         When would it be useful to make use of a Group BOM?

·         What is meant by area of validity and effectivity of a BOM?

·         Which item categories are available and what are their specifications?

·         What is a sub-item?

·         Under which circumstances could a BOM be recursive and what the usage of the recursive indicator?

·         What is the usage of the following BOM settings?

-          Explosion type

-          Relevant to production

-          Relevant to costing

-          Material provision indicator

-          Bulk material

-          Production storage location

Work Centers

·         What is a work center category?

·         What data can be maintained on the various views (basic, default, capacity, scheduling, costing, etc.)?

·         What is the purpose of a standard value key?

·         What role does the operation control key play?
What does referencing mean?

·         Why to use a work center hierarchy?
What is a pooled capacity?

·         Analyze the usage of the following fields?

-          Backflush indicator

-          Capacity category

-          Formulas for determining capacity requirements

-          Rate of capacity utilization

-          Relevant to finite scheduling indicator

-          Overload

-          Formulas for scheduling

-          Location group (move time matrix)

-          Queue times (normal and minimum)

-          Cost center

-          Activity types

-          Formulas for costing

Routings

·         What does a routing define?

·         How is a routing structured?

·         What task list types are available in the R/3 System?

·         What is a routing group and group counter?

·         What is a routing sequence, and what types of sequence are available?

·         What could be reasons to use sequences?

·         What are the various options to assign materials to routings?

·         Under which conditions would it make sense to assign components to operations?

·         What is a reference operation set?

·         How could the lotsize-dependend inhouse production time be calculated and updated into the material master?

Production Resources/Tools

·         What types of PRT are available?

·         What is the relationship between PRTs and a routing/operation?

Engineering Change Management

·         What are the objectives of Engineering Change Management?

·         What is the significance of changes with a history?

·         Which PP objects can be managed using Engineering Change Management?

·         What is the purpose of an engineering change request/order?

·         How is a change master record structured?

·         What is a revision level compared to engineering change master?

Other Issues

·         Which scheduling options are available, and how do they differ from each other?

·         Which time components are taken into account during scheduling?

·         How are basic order dates determined?

·         How are the scheduled dates determined?

·         Which scheduling types are available in lead time scheduling?

·         What role do reduction measures play in scheduling?

·         What types of scrap can be maintained in PP basic data and how would they be considered during MRP repectively scheduling?

·         What is external processing, and what conditions must be fulfilled before external processing can take place?

·         What are co-products?

2.   Production Planning

General Issues

·         What are the various planning levels available in R/3 PP?

·         What are the dependencies between Sales and Operations Planning, Demand Management, Long-Term-Planning and Material Requirements Planning?

Sales and Operations Planning

·         What is the purpose of Sales and Operations Planning?

·         What is the structure of product groups and how could they be used in SOP/DM/LTP/MRP?

·         What is the purpose of proportion factors and aggregation factors within product groups?

·         Which planning methods are available in SOP?

·         Which sources are available as input data for SOP?

·         Which options are available for creating a sales plan in SOP?

·         Which options are available for creating an operations plan in SOP?

·         What is ‘disaggregation’?

·         How could the result of SOP be passed on to different planning tools within the PP planning environment?

Demand Management

·         What is the purpose of Demand Management?

·         At which points is Demand Management integrated with Sales and Distribution?

·         Explain the main strategies in Make-to-Stock as well as in Make-to-Order planning logic. Pay attention to master data settings.

·         What does consumption respectively reduction mean in the context of planning strategies?

·         What role does the individual/collective requirements indicator in the material master have during make-to-order production?

·         What is a stocking level, and how can it be influenced?

·         Which types of availability check are available (ATP and check against planning) and what are the characteristics of these checks?

·         Explain the link between MRP group, strategy group, strategy and requirement class.

·         What settings could be made in requirements classes (on PP as well as on SD side)?

·         Explain the purpose  of version management in Demand Management?

Master Production Scheduling

·         Under which circumstances would you recommend the usage of MPS?

·         Compare the functionality of MPS with MRP?

·         What is meant by the ‘firming’ of procurement proposals, and how can this effect be achieved?

·         What is a planning time fence, and where is it defined?

·         What is a manual firming date, and where is it defined?

·         How can a planned order be ‘firmed’, and which firming indicators are available in a planned order?

Material Requirements Planning

·         What is the purpose of MRP and how does it fit into the PP planning environment?

·         How would you organize MRP runs? Discuss the different options

-          MRP for a plant – online

-          MRP for a plant – in background

-          MRP for a material (individual planning) - online

·         Which planning types are available (NEUPL, NETCH, NETPL)?

·         Which planning parameters are to be set in the application itself?

·         What is the function of the planning file?

·         What is meant by single-level planning, multi-level planning?

·         What is meant by interactive MRP?

·         What are the characteristics of an MRP scenario that is performed in simulation mode?

·         What is meant by low-level code and how is it considered in MRP?

·         What is a net requirements calculation?

·         Which buffers can be taken into account for the net requirements calculation in MRP (quantity buffer: safety stock, time buffer: safety time)?

·         What does lot-size calculation entail?

·         Which lot-sizing procedures are available in the R/3 System (static, periodic and optimizing procedures)? What are the characteristics of these lot-sizing procedures?

·         How does the procurement type defined in the material master affect MRP?

·         What is backward scheduling? What are the characteristics of backward scheduling?

·         What is the difference between basic scheduling and lead time scheduling?

·         How are the order due dates determined in basic scheduling?

·         How are the order due dates determined in lead time scheduling?

·         How does the in-house production time defined in the material master affect scheduling?

·         How does the scheduling margin key affect scheduling?

·         How are BOMs selected in MRP? Which criteria are taken into account during BOM selection?

·         What is a ‘BOM selection ID’?

·         How are alternative BOMs selected?

·         What is a production version?

·         How are routings selected in MRP? Which criteria are taken into account during routing selection?

·         What is an MRP list? What is a stock/requirements list? How are these lists structured? What are the differences between these lists?

·         What is the function of exception messages?

·         What are planned orders?

·         What is meant by the individual/collective conversion of planned orders?

·         What is meant by “days’ supply” and “receipt days’ supply”?

·         How can component discontinuation be managed in MRP?

原文地址:https://www.cnblogs.com/minideas/p/2129435.html